The contract to construct Station 552 was signed and awarded to Eversole Builders in October of 2015. The physcial address for this new station is 8485 Lithopolis Rd and is almost directly across the road from the current Trustee Hall. This station is located on the south side of Lithopolis Rd

 

Eversole Builders officially broke ground on Station 552 on November 19th 2015 and construction is on schdule thanks to the somewhat mild winter.

 

All exterior framing has been completed. The metal siding has been installed all the way around the building and all windows have been installed. The roof has been sheated and the dimensional shingles have been installed. All rough ins have been finished and all interior concrete has been poured. Drywall has been hung, taped, mudded and primered. The drop celeings are hung and final mechanicals are getting ran. All the decorative white metal has been installed in the bays, all lighting has been installed and most of the switches and outlets are being finalized. 

 

Please keep checking back for more updates and additional pictures of the current status of the build. 

Most Recent Construction Photos

bottom of page